Invitation to Bid for 2016 Annual Street Preservation

Project Description: The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the 2016 Annual Street Preservation project.  Specific work includes, but is not limited to, the removal and replacement of existing cement concrete curb, gutter, sidewalks, curb ramps, planning bituminous pavement, pavement repair excavation including haul, pavement marking, utility adjustment, edge and landscaping restoration and other Work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications.  The estimated cost for this project is in a range of $180,000 to $230,000.

Invitation To Bid 2016 Annual Street Preservation

File: http://mukilteowa.gov/wp-content/uploads/Invitation-To-Bid-2016-Annual-Street-Preservation.pdf
Link: https://mukilteowa.gov/news/invitation-to-bid-for-2016-annual-street-preservation/invitation-to-bid-2016-annual-street-preservation-2/
Navigation

Thank you for your upload