MUKILTEO WATER AND WASTEWATER DISTRICT SEWER LIFT STATION 5 FORCEMAIN UPGRADE PROJECT

MUKILTEO WATER AND WASTEWATER DISTRICT
SEWER LIFT STATION 5 FORCEMAIN UPGRADE PROJECT
Notice:
The Mukilteo Water and Wastewater District’s (District) Contractor, Road Construction NW, Inc. is scheduled to begin construction on the Sewer Lift Station 5 Forcemain (FM) Upgrade Project on Monday, March 22nd. A new 6” High Density Polyethylene (HDPE) FM will be installed directly under the existing FM by directional bore from the Lift Station site located at the bottom of Smugglers Gulch to the upper portion of 63rd PL W (project information and location map). Construction will start at the Lift Station site. We anticipate the entire Construction Project to take up to two months to complete, weather dependent. Most of the construction activity will take place at the Lift Station location.

Link to Mukilteo Water & Wastewater Districts Projects

File: https://mukilteowa.gov/wp-content/uploads/2021-MWWD-Sewer-Lift-Station-5-Upgrade-Project.pdf
Link: https://mukilteowa.gov/news/mukilteo-water-and-wastewater-district-sewer-lift-station-5-forcemain-upgrade-project/2021-mwwd-sewer-lift-station-5-upgrade-project/
Navigation

Thank you for your upload