RFQ-Chennault Beach Drive Drainage Improvements 03/01/2022

Chennault Beach Drive Drainage Improvements RFQ

Deadline: Tuesday, March 22, 2022, no later than 2:00 p.m.

PROJECT DESCRIPTION: The City of Mukilteo is requesting qualifications (RFQ) from qualified professionals or firms to provide professional services for the design and engineering of the Chennault Beach Drive Drainage Improvements project, with the option of construction management and inspection services.

The proposed improvements include installation of new drainage pipes within the existing roadside ditches; relocation of misplaced existing inlets; minor shoulder paving and asphalt curbing; re-establishment of ditch capacity; assessment, and potentially replacement, of existing driveway culverts; geotechnical investigation of existing retaining walls and the possible presence of unsuitable materials; and environmental permitting and documentation.  The design and construction phases of this project will be funded by local funds.  All aspects of this project will need to comply with the requirements of the funding agency, at a minimum.

 

 

 

File: http://mukilteowa.gov/wp-content/uploads/RFQ-FINAL-2.pdf
Link: https://mukilteowa.gov/news/chennault-beach-drive-drainage-improvements/rfq-final-4/
Navigation

Thank you for your upload